Demanding project using 600mm Fusible PVC pipe was one of the longest installs in Canada and first in Eastern Canada.
One of the most challenging aspects of this extensive project was installing piping systems underneath two separate 300-meter river crossings on the Rideau River. These crossings served a significant portion of Manotick residents that live on the island at the centre of town.