As a result of increased urban growth, sanitary sewer upgrades were planned to an existing Elk Vale lift station and sewer extension. Downstream from the lift station, plans for the sewer extension included the use of a Vortex Flow Insert to provide energy dissipation. To date, the Vortex Flow Insert has been working according to plan.